We look into all aspects of your project to see if it is viable and within budget
- Feasibility study of the proposed Maira Dam in Kenya and Bulusambu Dam in Uganda under the Nile Basin Initiative
- Feasibility study of the following proposed KETRACO transmission line projects: Meru – Maua 132kV, Gitaru – Athi River 220 kV; Nyahururu – Maralal 132 kV, Sondu – Homa Bay 132 kV, Homa Bay – Awendo – Isebania 132 kV, Turkwel – Ortum – Kitale 220 kV, Ishiara – Chogoria 132 kV
- Feasibility studies including Environmental and Social Impact Assessment (ESIA) of the proposed Ethiopia – Kenya Power Interconnector Project
- Pre-feasibility and feasibility studies for double-circuit 220 kV inter-connector between Lessos in Kenya and Tororo in Uganda including Environmental and Social Impact Assessment (ESIA) and Resettlement Action Plan (RAP)
- Kenya Electricity Tariff Studies, 2007
- Feasibility study and design of Gaba 1 water treatment works, Kampala
- Feasibility studies for rehabilitation of Nyeri water and sewerage works
- Feasibility study and collection of data for KenGen’s closed-cycle generator at Kipevu in Mombasa, Kenya
- Feasibility and data collection for KenGen’s redevelopment of Tana Hydro Station, Kenya